Please review this checklist before our arrival. The property must be in a finished state with all seals in place. If the building is not ready, the test may fail or need to be aborted.

General Site Requirements

Access: Unrestricted access to all areas for 1–2 hours.
Power: 240v (or 110v if notified prior) power supply required.
Parking: Vehicle parking available close to the property.
Quiet Site: Quiet environment required for the test duration.
Remedial Work: Materials/trades available if minor sealing work needed on the day.
Adjacent Plots: Semi-detached/terrace properties require access to adjacent plots with windows open.

Temporary Sealing (By Tester)

Trickle vents to windows will be closed and sealed.
External ventilation grills temporarily sealed — ensure safe access.
Internal grilles on partition walls do not require sealing.
Chimneys must be sealable (e.g. by balloon) and blocked.
Log burners: flue sealed to chimney plate; purge vents temporarily sealed.

Property Requirements

External Envelope: MUST be finished with all seals in place.
Plasterboard & Skirting: Fitted and sealed, including edge sealing to floor.
Electrics: All switches, sockets and light fittings in place. Loose down-lighters pushed in and sealed.
Service Penetrations: All incoming penetrations complete and sealed.
Boiler Flue: Collar sealed to plasterboard. Boilers switched off for test.
Doors & Windows: Fitted with draught strips, able to close. No missing glass or temporary panels. Internal doors must be openable.
Plumbing: Sanitary ware fitted, drainage traps filled with water (check shower trays).
Hidden Pipework: Holes for kitchen/bath/washbasin pipes sealed (check behind kick plates, bath panels). Boxed-in pipework sealed.
Loft Hatch: Fitted snugly, frame sealed to ceiling plasterboard.