New-build dwellings
Testing can form part of the Part L evidence required before completion. The project’s SAP assessor and Building Control team should confirm the target and test scope.
Part L · air permeability
Air pressure testing for new-build homes, extensions and commercial projects, with practical preparation guidance and clear evidence for your project team.
What the test does
Air tightness testing—also called air pressure, air leakage or air permeability testing—uses a calibrated fan to create a pressure difference across the building envelope. The measured airflow is used to calculate the result required by the project.
Testing can form part of the Part L evidence required before completion. The project’s SAP assessor and Building Control team should confirm the target and test scope.
Non-domestic projects may also need air permeability evidence. Building size, design documentation and the required test standard help determine the setup.
Requirements vary. Share the approved design and Building Control request so the correct evidence can be discussed before a booking is made.
From enquiry to report
We review the address, building type, target, drawings and the stage of work.
You receive guidance covering the envelope, openings, traps and service penetrations.
The fan and pressure equipment are set up and readings are taken under the agreed method.
The measured result and relevant report information are provided for the project record.
Site readiness
A test is most useful when the intended air barrier is complete and accessible problems have been resolved before the visit. Typical preparation includes:
Common questions
The terms are commonly used for the same fan-pressure test used to measure uncontrolled leakage through a building envelope. “Air permeability” describes the calculated result used for many compliance projects.
Book early enough to secure a suitable date and allow preparation. The final compliance test is normally planned when the envelope and relevant penetrations are complete, but the exact stage depends on the project.
It depends on building size, access, preparation and the evidence required. Send the plans and property details for a realistic appointment allowance.
The test result can guide investigation of leakage paths. Remedial work and a retest may then be appropriate, subject to the design team and Building Control requirements.
No. The required result comes from the project design and compliance route. Confirm the target with the SAP assessor or design team before the test.