New dwellings
Assess proposed homes against the relevant Part L route and prepare the calculation information needed by the design and Building Control teams.
Part L · residential energy
Design and as-built energy assessment support for new dwellings, conversions and relevant residential projects, coordinated from specification through to completion evidence.
Why start early?
SAP models the predicted energy performance of a dwelling using its geometry, fabric, heating, hot water, ventilation, lighting and renewable technologies. Starting at design stage helps the team identify where the proposed specification needs attention.
Assess proposed homes against the relevant Part L route and prepare the calculation information needed by the design and Building Control teams.
Residential conversions may need energy calculations or supporting evidence depending on the approved scope. Share the Building Control request before work progresses.
Update the model to match what was installed, including test results and product information, before as-built outputs are finalised.
Project stages
Provide scaled plans, elevations, sections, orientation and construction build-ups.
Model the proposed fabric, systems and technologies and identify required clarifications.
Track product substitutions, insulation evidence, heating details and site variations.
Add final specifications and relevant test evidence for the completion calculation and EPC route.
Documents and specifications
Supplying clear information at the start reduces assumptions and repeated queries. Typical inputs include:
Common questions
Design-stage SAP assesses the proposed specification before construction. As-built SAP uses the final installed specification, approved changes and completion evidence.
Begin before construction details and services are fixed. That leaves time to assess insulation, glazing, heating, ventilation and renewable choices while changes are still practical.
SAP is the methodology used for new-dwelling energy assessment and can lead to an on-construction EPC. Existing homes normally use the current existing-dwelling methodology instead.
The as-built assessment uses the applicable air permeability result or another permitted project input. Send the final test evidence before completion outputs are prepared.
Yes, but changes should be reported promptly with product details and evidence. Some substitutions can materially affect the calculation and may require a design response.
Related services
Send the plans, site address and current project stage.