Extract fans
Measure airflow at kitchen, bathroom, utility and WC terminals where intermittent or continuous extract is installed.
Part F · measured airflow
Airflow measurement for extract fans, MEV and MVHR systems, helping builders, installers and property teams assemble clear ventilation evidence.
Why measure airflow?
Good ventilation depends on the installed system, the fan settings, ductwork, terminals and the route air takes through the property. Testing provides measured values that can be compared with the project design and applicable requirements.
Measure airflow at kitchen, bathroom, utility and WC terminals where intermittent or continuous extract is installed.
Check continuous extract terminals and system settings across the dwelling, subject to the installed design and access.
Record supply and extract airflow at accessible terminals so system balancing and commissioning evidence can be reviewed.
Testing route
Confirm the ventilation type, intended flow rates, dwelling information and evidence needed.
The system should be installed, powered, accessible, clean and set to the correct operating mode.
Suitable airflow equipment is used at the relevant supply or extract terminals.
Results are set out clearly so the installer and project team can complete their records.
Before the visit
Incomplete installation and blocked access are common causes of delays. Before the appointment:
Common questions
The scope can include intermittent extract fans, continuous mechanical extract ventilation and mechanical ventilation with heat recovery, subject to the design, access and evidence required.
Book once the system is installed, powered, accessible and ready for commissioning. Allow time before handover in case the installer needs to make adjustments.
Yes, where available. The intended rates and ventilation strategy help the tester understand what the installed system is meant to achieve.
No. The installer remains responsible for the system and its setup. Agree the required records and responsibilities before the visit.
Often, yes, if both systems and the building envelope are ready. Send the project programme so the most practical order can be discussed.
Related services
Send the property address, system type and target completion date.